204 lines
5.2 KiB
Markdown
204 lines
5.2 KiB
Markdown
|
|
# Deployment Testing Strategy
|
||
|
|
|
||
|
|
This document outlines the strategy for testing deployments to ensure successful and reliable deployments to production and staging environments.
|
||
|
|
|
||
|
|
## Current Deployment Process
|
||
|
|
|
||
|
|
### Deployment Scripts
|
||
|
|
- **Primary Script**: `deploy/ssh/deploy-remote.sh`
|
||
|
|
- **Python Version**: `deploy/ssh/deploy-remote.py`
|
||
|
|
- **Target Server**: 95.111.206.155 (root user)
|
||
|
|
- **Configuration**: Git-ignored deployment configuration
|
||
|
|
|
||
|
|
### Current Capabilities
|
||
|
|
- SSH-based deployment
|
||
|
|
- Environment-specific configurations (production, staging)
|
||
|
|
- Dry-run mode for testing
|
||
|
|
- Key management system
|
||
|
|
- Configuration validation
|
||
|
|
|
||
|
|
## Deployment Testing Strategy
|
||
|
|
|
||
|
|
### 1. Pre-Deployment Testing
|
||
|
|
|
||
|
|
#### Local Validation
|
||
|
|
```bash
|
||
|
|
# Run all tests before deployment
|
||
|
|
./scripts/run-reliable-e2e-tests.py
|
||
|
|
pytest tests/unit/
|
||
|
|
pytest tests/integration/
|
||
|
|
```
|
||
|
|
|
||
|
|
#### Configuration Validation
|
||
|
|
```bash
|
||
|
|
# Validate deployment configuration
|
||
|
|
deploy/ssh/deploy-remote.sh -e production --dry-run --verbose
|
||
|
|
```
|
||
|
|
|
||
|
|
### 2. Staging Environment Testing
|
||
|
|
|
||
|
|
#### Recommended Enhancement
|
||
|
|
Create a staging environment for pre-production testing:
|
||
|
|
|
||
|
|
1. **Staging Server**: Separate server for testing deployments
|
||
|
|
2. **Smoke Tests**: Automated tests that verify deployment success
|
||
|
|
3. **Integration Tests**: Test with staging SCADA/optimizer services
|
||
|
|
4. **Rollback Testing**: Verify rollback procedures work
|
||
|
|
|
||
|
|
### 3. Post-Deployment Testing
|
||
|
|
|
||
|
|
#### Current Manual Process
|
||
|
|
After deployment, manually verify:
|
||
|
|
- Services are running
|
||
|
|
- Health endpoints respond
|
||
|
|
- Basic functionality works
|
||
|
|
|
||
|
|
#### Recommended Automated Process
|
||
|
|
Create automated smoke tests:
|
||
|
|
|
||
|
|
```bash
|
||
|
|
# Post-deployment smoke tests
|
||
|
|
./scripts/deployment-smoke-tests.sh
|
||
|
|
```
|
||
|
|
|
||
|
|
## Proposed Deployment Test Structure
|
||
|
|
|
||
|
|
### Directory Structure
|
||
|
|
```
|
||
|
|
tests/
|
||
|
|
├── deployment/ # Deployment-specific tests
|
||
|
|
│ ├── smoke_tests.py # Post-deployment smoke tests
|
||
|
|
│ ├── staging_tests.py # Staging environment tests
|
||
|
|
│ └── rollback_tests.py # Rollback procedure tests
|
||
|
|
└── e2e/ # Existing e2e tests (mock-dependent)
|
||
|
|
```
|
||
|
|
|
||
|
|
### Deployment Test Categories
|
||
|
|
|
||
|
|
#### 1. Smoke Tests (`tests/deployment/smoke_tests.py`)
|
||
|
|
- **Purpose**: Verify basic functionality after deployment
|
||
|
|
- **Execution**: Run on deployed environment
|
||
|
|
- **Tests**:
|
||
|
|
- Service health checks
|
||
|
|
- API endpoint availability
|
||
|
|
- Database connectivity
|
||
|
|
- Basic workflow validation
|
||
|
|
|
||
|
|
#### 2. Staging Tests (`tests/deployment/staging_tests.py`)
|
||
|
|
- **Purpose**: Full test suite on staging environment
|
||
|
|
- **Execution**: Run on staging server
|
||
|
|
- **Tests**:
|
||
|
|
- Complete e2e workflows
|
||
|
|
- Integration with staging services
|
||
|
|
- Performance validation
|
||
|
|
- Security compliance
|
||
|
|
|
||
|
|
#### 3. Rollback Tests (`tests/deployment/rollback_tests.py`)
|
||
|
|
- **Purpose**: Verify rollback procedures work
|
||
|
|
- **Execution**: Test rollback scenarios
|
||
|
|
- **Tests**:
|
||
|
|
- Database rollback
|
||
|
|
- Configuration rollback
|
||
|
|
- Service restart procedures
|
||
|
|
|
||
|
|
## Implementation Plan
|
||
|
|
|
||
|
|
### Phase 1: Smoke Tests
|
||
|
|
1. Create `tests/deployment/smoke_tests.py`
|
||
|
|
2. Add basic health and connectivity tests
|
||
|
|
3. Integrate with deployment script
|
||
|
|
4. Run automatically after deployment
|
||
|
|
|
||
|
|
### Phase 2: Staging Environment
|
||
|
|
1. Set up staging server
|
||
|
|
2. Configure staging services
|
||
|
|
3. Create staging-specific tests
|
||
|
|
4. Run full test suite on staging
|
||
|
|
|
||
|
|
### Phase 3: Automated Deployment Pipeline
|
||
|
|
1. Integrate deployment tests with CI/CD
|
||
|
|
2. Add automated rollback triggers
|
||
|
|
3. Implement deployment metrics
|
||
|
|
4. Create deployment dashboards
|
||
|
|
|
||
|
|
## Current Deployment Script Usage
|
||
|
|
|
||
|
|
### Dry Run (Safe Testing)
|
||
|
|
```bash
|
||
|
|
# Test deployment without actually deploying
|
||
|
|
deploy/ssh/deploy-remote.sh -e production --dry-run --verbose
|
||
|
|
```
|
||
|
|
|
||
|
|
### Actual Deployment
|
||
|
|
```bash
|
||
|
|
# Deploy to production
|
||
|
|
deploy/ssh/deploy-remote.sh -e production
|
||
|
|
```
|
||
|
|
|
||
|
|
### With Custom Configuration
|
||
|
|
```bash
|
||
|
|
# Use custom configuration
|
||
|
|
deploy/ssh/deploy-remote.sh -e production -c deploy/config/custom.yaml
|
||
|
|
```
|
||
|
|
|
||
|
|
## Integration with Existing Tests
|
||
|
|
|
||
|
|
### Mock Services vs Real Deployment
|
||
|
|
- **Mock Services**: Use for development and local testing
|
||
|
|
- **Staging Services**: Use for pre-production testing
|
||
|
|
- **Production Services**: Use for post-deployment verification
|
||
|
|
|
||
|
|
### Test Execution Flow
|
||
|
|
```
|
||
|
|
Local Development → Mock Services → Unit/Integration Tests
|
||
|
|
↓
|
||
|
|
Staging Deployment → Staging Services → Deployment Tests
|
||
|
|
↓
|
||
|
|
Production Deployment → Production Services → Smoke Tests
|
||
|
|
```
|
||
|
|
|
||
|
|
## Security Considerations
|
||
|
|
|
||
|
|
### Deployment Security
|
||
|
|
- SSH key management
|
||
|
|
- Configuration encryption
|
||
|
|
- Access control
|
||
|
|
- Audit logging
|
||
|
|
|
||
|
|
### Test Data Security
|
||
|
|
- Use test data in staging
|
||
|
|
- Never use production data in tests
|
||
|
|
- Secure test credentials
|
||
|
|
- Clean up test data
|
||
|
|
|
||
|
|
## Monitoring and Metrics
|
||
|
|
|
||
|
|
### Deployment Metrics
|
||
|
|
- Deployment success rate
|
||
|
|
- Rollback frequency
|
||
|
|
- Test coverage percentage
|
||
|
|
- Performance impact
|
||
|
|
|
||
|
|
### Health Monitoring
|
||
|
|
- Service uptime
|
||
|
|
- Response times
|
||
|
|
- Error rates
|
||
|
|
- Resource utilization
|
||
|
|
|
||
|
|
## Next Steps
|
||
|
|
|
||
|
|
### Immediate Actions
|
||
|
|
1. Create basic smoke tests in `tests/deployment/`
|
||
|
|
2. Update deployment script to run smoke tests
|
||
|
|
3. Document deployment verification procedures
|
||
|
|
|
||
|
|
### Medium Term
|
||
|
|
1. Set up staging environment
|
||
|
|
2. Create comprehensive deployment test suite
|
||
|
|
3. Integrate with CI/CD pipeline
|
||
|
|
|
||
|
|
### Long Term
|
||
|
|
1. Implement automated rollback
|
||
|
|
2. Create deployment dashboards
|
||
|
|
3. Add performance benchmarking
|
||
|
|
4. Implement canary deployments
|