Update README with detailed Phase 3 completion status

- Added detailed implementation status for Phase 3 (Setpoint Logic)
- Listed all three calculator types implemented
- Updated current status with 133 tests passing
- Added recent updates section with SetpointManager integration details
This commit is contained in:
openhands 2025-10-27 13:32:32 +00:00
parent 6b023e48d1
commit db0ace8d2c
1 changed files with 30 additions and 2 deletions

View File

@ -27,11 +27,39 @@ The Calejo Control Adapter translates optimized pump control plans from Calejo O
- Alert management system - Alert management system
**Phase 3**: Setpoint Management **Phase 3**: Setpoint Management
- Setpoint Manager for real-time control - Setpoint Manager for real-time control with three calculator types:
- `DIRECT_SPEED`: Direct speed control
- `LEVEL_CONTROLLED`: Level-based control with feedback
- `POWER_CONTROLLED`: Power-based control with feedback
- Integration with all safety components - Integration with all safety components
- Unified main application - Unified main application
- 15 comprehensive unit tests for SetpointManager
All components are implemented and tested with 133 passing tests. 🔄 **Phase 4**: Security Layer (In Progress)
- Authentication and authorization
- Audit logging
- TLS/SSL encryption
**Phase 5**: Protocol Servers (Pending)
- Enhanced protocol implementations
- Protocol-specific optimizations
**Phase 6**: Integration and Testing (Pending)
- End-to-end testing
- Validation with real SCADA systems
**Phase 7**: Production Hardening (Pending)
- Performance optimization
- Monitoring and alerting
**Current Status**: All 133 tests passing (100% success rate)
**Recent Updates**:
- SetpointManager fully integrated with main application
- Added start/stop methods for SetpointManager
- Fixed configuration settings and database pool parameters
- Updated protocol server initializations
- Verified main application starts and stops gracefully
### Key Features ### Key Features