From f8623e9ec74d5368f77404381227ef910935ab31 Mon Sep 17 00:00:00 2001 From: openhands Date: Tue, 28 Oct 2025 15:20:46 +0000 Subject: [PATCH] Fix: Phase 6 status corrected to IN PROGRESS - Phase 6 marked as IN PROGRESS instead of COMPLETE - Added detailed current status for each Phase 6 task - Identified missing optimization-to-SCADA integration tests - Updated task statuses to reflect actual completion state - Added TASK-6.5 for health monitoring and metrics Missing components: - Optimization-to-SCADA integration tests - Performance and load testing - Failure mode and recovery tests - Comprehensive health monitoring --- IMPLEMENTATION_PLAN.md | 28 +++++++++++++++++++++------- 1 file changed, 21 insertions(+), 7 deletions(-) diff --git a/IMPLEMENTATION_PLAN.md b/IMPLEMENTATION_PLAN.md index 657bff4..df4635b 100644 --- a/IMPLEMENTATION_PLAN.md +++ b/IMPLEMENTATION_PLAN.md @@ -23,7 +23,7 @@ This document outlines the comprehensive step-by-step implementation plan for th | Phase 3: Setpoint Management | ✅ **COMPLETE** | 2025-10-26 | All tests passing | | Phase 4: Security Layer | ✅ **COMPLETE** | 2025-10-27 | 56/56 security tests | | Phase 5: Protocol Servers | ✅ **COMPLETE** | 2025-10-28 | 230/230 tests passing, main app integration fixed | -| Phase 6: Integration & Testing | ✅ **COMPLETE** | 234/234 | 2025-10-28 | +| Phase 6: Integration & Testing | ⏳ **IN PROGRESS** | 234/234 | - | | Phase 7: Production Hardening | ⏳ **PENDING** | - | - | **Overall Test Status:** 234/234 tests passing across all implemented components @@ -394,11 +394,11 @@ This document outlines the comprehensive step-by-step implementation plan for th **Phase 5 Summary**: ✅ **220 total tests passing** - All protocol servers enhanced with security integration, performance optimizations, and comprehensive monitoring. Implementation exceeds requirements with additional performance features and production readiness. **Main application integration issue resolved**. -### Phase 6: Integration & System Testing (Week 10-11) ✅ **COMPLETE** +### Phase 6: Integration & System Testing (Week 10-11) ⏳ **IN PROGRESS** **Objective**: End-to-end testing and validation of the complete system. -#### TASK-6.1: Set up test database with realistic data ✅ **COMPLETE** +#### TASK-6.1: Set up test database with realistic data ⏳ **IN PROGRESS** - **Description**: Create test data for multiple stations and pump scenarios - **Test Data**: - Multiple pump stations with different configurations @@ -411,8 +411,9 @@ This document outlines the comprehensive step-by-step implementation plan for th - Data relationships maintained - Performance testing possible - Edge cases represented +- **Current Status**: Basic test data exists but needs expansion for full scenarios -#### TASK-6.2: Create end-to-end integration tests ✅ **COMPLETE** +#### TASK-6.2: Create end-to-end integration tests ⏳ **IN PROGRESS** - **Description**: Test full system workflow from optimization to SCADA - **Test Workflows**: - Normal optimization control flow @@ -425,8 +426,9 @@ This document outlines the comprehensive step-by-step implementation plan for th - Data flows through entire system - Performance meets requirements - Error conditions handled appropriately +- **Current Status**: Basic workflow tests exist but missing optimization-to-SCADA integration -#### TASK-6.3: Implement performance and load testing ✅ **COMPLETE** +#### TASK-6.3: Implement performance and load testing ⏳ **PENDING** - **Description**: Test system under load with multiple pumps and protocols - **Load Testing**: - Concurrent protocol connections @@ -439,22 +441,34 @@ This document outlines the comprehensive step-by-step implementation plan for th - Response times within requirements - Resource utilization acceptable - No memory leaks or performance degradation +- **Current Status**: Not implemented -#### TASK-6.4: Create failure mode and recovery tests ✅ **COMPLETE** +#### TASK-6.4: Create failure mode and recovery tests ⏳ **PENDING** - **Description**: Test system behavior during failures and recovery - **Failure Scenarios**: - Database connection loss - Network connectivity issues - Protocol server failures - Safety system failures + - Emergency stop scenarios - Resource exhaustion +- **Recovery Testing**: + - Automatic failover procedures + - System restart and recovery + - Data consistency after recovery + - Manual intervention procedures - **Acceptance Criteria**: + - System handles failures gracefully + - Recovery procedures work correctly + - No data loss during failures + - Manual override capabilities functional - System fails safely - Recovery automatic where possible - Alerts generated for failures - Data integrity maintained +- **Current Status**: Not implemented -#### TASK-6.5: Implement health monitoring and metrics +#### TASK-6.5: Implement health monitoring and metrics ⏳ **PENDING** - **Description**: Prometheus metrics and health checks - **Monitoring Areas**: - System health and availability