Fix: Phase 6 status corrected to IN PROGRESS
- Phase 6 marked as IN PROGRESS instead of COMPLETE - Added detailed current status for each Phase 6 task - Identified missing optimization-to-SCADA integration tests - Updated task statuses to reflect actual completion state - Added TASK-6.5 for health monitoring and metrics Missing components: - Optimization-to-SCADA integration tests - Performance and load testing - Failure mode and recovery tests - Comprehensive health monitoring
This commit is contained in:
parent
c890c4b1e3
commit
f8623e9ec7
|
|
@ -23,7 +23,7 @@ This document outlines the comprehensive step-by-step implementation plan for th
|
||||||
| Phase 3: Setpoint Management | ✅ **COMPLETE** | 2025-10-26 | All tests passing |
|
| Phase 3: Setpoint Management | ✅ **COMPLETE** | 2025-10-26 | All tests passing |
|
||||||
| Phase 4: Security Layer | ✅ **COMPLETE** | 2025-10-27 | 56/56 security tests |
|
| Phase 4: Security Layer | ✅ **COMPLETE** | 2025-10-27 | 56/56 security tests |
|
||||||
| Phase 5: Protocol Servers | ✅ **COMPLETE** | 2025-10-28 | 230/230 tests passing, main app integration fixed |
|
| Phase 5: Protocol Servers | ✅ **COMPLETE** | 2025-10-28 | 230/230 tests passing, main app integration fixed |
|
||||||
| Phase 6: Integration & Testing | ✅ **COMPLETE** | 234/234 | 2025-10-28 |
|
| Phase 6: Integration & Testing | ⏳ **IN PROGRESS** | 234/234 | - |
|
||||||
| Phase 7: Production Hardening | ⏳ **PENDING** | - | - |
|
| Phase 7: Production Hardening | ⏳ **PENDING** | - | - |
|
||||||
|
|
||||||
**Overall Test Status:** 234/234 tests passing across all implemented components
|
**Overall Test Status:** 234/234 tests passing across all implemented components
|
||||||
|
|
@ -394,11 +394,11 @@ This document outlines the comprehensive step-by-step implementation plan for th
|
||||||
|
|
||||||
**Phase 5 Summary**: ✅ **220 total tests passing** - All protocol servers enhanced with security integration, performance optimizations, and comprehensive monitoring. Implementation exceeds requirements with additional performance features and production readiness. **Main application integration issue resolved**.
|
**Phase 5 Summary**: ✅ **220 total tests passing** - All protocol servers enhanced with security integration, performance optimizations, and comprehensive monitoring. Implementation exceeds requirements with additional performance features and production readiness. **Main application integration issue resolved**.
|
||||||
|
|
||||||
### Phase 6: Integration & System Testing (Week 10-11) ✅ **COMPLETE**
|
### Phase 6: Integration & System Testing (Week 10-11) ⏳ **IN PROGRESS**
|
||||||
|
|
||||||
**Objective**: End-to-end testing and validation of the complete system.
|
**Objective**: End-to-end testing and validation of the complete system.
|
||||||
|
|
||||||
#### TASK-6.1: Set up test database with realistic data ✅ **COMPLETE**
|
#### TASK-6.1: Set up test database with realistic data ⏳ **IN PROGRESS**
|
||||||
- **Description**: Create test data for multiple stations and pump scenarios
|
- **Description**: Create test data for multiple stations and pump scenarios
|
||||||
- **Test Data**:
|
- **Test Data**:
|
||||||
- Multiple pump stations with different configurations
|
- Multiple pump stations with different configurations
|
||||||
|
|
@ -411,8 +411,9 @@ This document outlines the comprehensive step-by-step implementation plan for th
|
||||||
- Data relationships maintained
|
- Data relationships maintained
|
||||||
- Performance testing possible
|
- Performance testing possible
|
||||||
- Edge cases represented
|
- Edge cases represented
|
||||||
|
- **Current Status**: Basic test data exists but needs expansion for full scenarios
|
||||||
|
|
||||||
#### TASK-6.2: Create end-to-end integration tests ✅ **COMPLETE**
|
#### TASK-6.2: Create end-to-end integration tests ⏳ **IN PROGRESS**
|
||||||
- **Description**: Test full system workflow from optimization to SCADA
|
- **Description**: Test full system workflow from optimization to SCADA
|
||||||
- **Test Workflows**:
|
- **Test Workflows**:
|
||||||
- Normal optimization control flow
|
- Normal optimization control flow
|
||||||
|
|
@ -425,8 +426,9 @@ This document outlines the comprehensive step-by-step implementation plan for th
|
||||||
- Data flows through entire system
|
- Data flows through entire system
|
||||||
- Performance meets requirements
|
- Performance meets requirements
|
||||||
- Error conditions handled appropriately
|
- Error conditions handled appropriately
|
||||||
|
- **Current Status**: Basic workflow tests exist but missing optimization-to-SCADA integration
|
||||||
|
|
||||||
#### TASK-6.3: Implement performance and load testing ✅ **COMPLETE**
|
#### TASK-6.3: Implement performance and load testing ⏳ **PENDING**
|
||||||
- **Description**: Test system under load with multiple pumps and protocols
|
- **Description**: Test system under load with multiple pumps and protocols
|
||||||
- **Load Testing**:
|
- **Load Testing**:
|
||||||
- Concurrent protocol connections
|
- Concurrent protocol connections
|
||||||
|
|
@ -439,22 +441,34 @@ This document outlines the comprehensive step-by-step implementation plan for th
|
||||||
- Response times within requirements
|
- Response times within requirements
|
||||||
- Resource utilization acceptable
|
- Resource utilization acceptable
|
||||||
- No memory leaks or performance degradation
|
- No memory leaks or performance degradation
|
||||||
|
- **Current Status**: Not implemented
|
||||||
|
|
||||||
#### TASK-6.4: Create failure mode and recovery tests ✅ **COMPLETE**
|
#### TASK-6.4: Create failure mode and recovery tests ⏳ **PENDING**
|
||||||
- **Description**: Test system behavior during failures and recovery
|
- **Description**: Test system behavior during failures and recovery
|
||||||
- **Failure Scenarios**:
|
- **Failure Scenarios**:
|
||||||
- Database connection loss
|
- Database connection loss
|
||||||
- Network connectivity issues
|
- Network connectivity issues
|
||||||
- Protocol server failures
|
- Protocol server failures
|
||||||
- Safety system failures
|
- Safety system failures
|
||||||
|
- Emergency stop scenarios
|
||||||
- Resource exhaustion
|
- Resource exhaustion
|
||||||
|
- **Recovery Testing**:
|
||||||
|
- Automatic failover procedures
|
||||||
|
- System restart and recovery
|
||||||
|
- Data consistency after recovery
|
||||||
|
- Manual intervention procedures
|
||||||
- **Acceptance Criteria**:
|
- **Acceptance Criteria**:
|
||||||
|
- System handles failures gracefully
|
||||||
|
- Recovery procedures work correctly
|
||||||
|
- No data loss during failures
|
||||||
|
- Manual override capabilities functional
|
||||||
- System fails safely
|
- System fails safely
|
||||||
- Recovery automatic where possible
|
- Recovery automatic where possible
|
||||||
- Alerts generated for failures
|
- Alerts generated for failures
|
||||||
- Data integrity maintained
|
- Data integrity maintained
|
||||||
|
- **Current Status**: Not implemented
|
||||||
|
|
||||||
#### TASK-6.5: Implement health monitoring and metrics
|
#### TASK-6.5: Implement health monitoring and metrics ⏳ **PENDING**
|
||||||
- **Description**: Prometheus metrics and health checks
|
- **Description**: Prometheus metrics and health checks
|
||||||
- **Monitoring Areas**:
|
- **Monitoring Areas**:
|
||||||
- System health and availability
|
- System health and availability
|
||||||
|
|
|
||||||