Fix: Phase 6 status corrected to IN PROGRESS

- Phase 6 marked as IN PROGRESS instead of COMPLETE
- Added detailed current status for each Phase 6 task
- Identified missing optimization-to-SCADA integration tests
- Updated task statuses to reflect actual completion state
- Added TASK-6.5 for health monitoring and metrics

Missing components:
- Optimization-to-SCADA integration tests
- Performance and load testing
- Failure mode and recovery tests
- Comprehensive health monitoring
This commit is contained in:
openhands 2025-10-28 15:20:46 +00:00
parent c890c4b1e3
commit f8623e9ec7
1 changed files with 21 additions and 7 deletions

View File

@ -23,7 +23,7 @@ This document outlines the comprehensive step-by-step implementation plan for th
| Phase 3: Setpoint Management | ✅ **COMPLETE** | 2025-10-26 | All tests passing |
| Phase 4: Security Layer | ✅ **COMPLETE** | 2025-10-27 | 56/56 security tests |
| Phase 5: Protocol Servers | ✅ **COMPLETE** | 2025-10-28 | 230/230 tests passing, main app integration fixed |
| Phase 6: Integration & Testing | **COMPLETE** | 234/234 | 2025-10-28 |
| Phase 6: Integration & Testing | **IN PROGRESS** | 234/234 | - |
| Phase 7: Production Hardening | ⏳ **PENDING** | - | - |
**Overall Test Status:** 234/234 tests passing across all implemented components
@ -394,11 +394,11 @@ This document outlines the comprehensive step-by-step implementation plan for th
**Phase 5 Summary**: ✅ **220 total tests passing** - All protocol servers enhanced with security integration, performance optimizations, and comprehensive monitoring. Implementation exceeds requirements with additional performance features and production readiness. **Main application integration issue resolved**.
### Phase 6: Integration & System Testing (Week 10-11) ✅ **COMPLETE**
### Phase 6: Integration & System Testing (Week 10-11) ⏳ **IN PROGRESS**
**Objective**: End-to-end testing and validation of the complete system.
#### TASK-6.1: Set up test database with realistic data ✅ **COMPLETE**
#### TASK-6.1: Set up test database with realistic data ⏳ **IN PROGRESS**
- **Description**: Create test data for multiple stations and pump scenarios
- **Test Data**:
- Multiple pump stations with different configurations
@ -411,8 +411,9 @@ This document outlines the comprehensive step-by-step implementation plan for th
- Data relationships maintained
- Performance testing possible
- Edge cases represented
- **Current Status**: Basic test data exists but needs expansion for full scenarios
#### TASK-6.2: Create end-to-end integration tests ✅ **COMPLETE**
#### TASK-6.2: Create end-to-end integration tests ⏳ **IN PROGRESS**
- **Description**: Test full system workflow from optimization to SCADA
- **Test Workflows**:
- Normal optimization control flow
@ -425,8 +426,9 @@ This document outlines the comprehensive step-by-step implementation plan for th
- Data flows through entire system
- Performance meets requirements
- Error conditions handled appropriately
- **Current Status**: Basic workflow tests exist but missing optimization-to-SCADA integration
#### TASK-6.3: Implement performance and load testing ✅ **COMPLETE**
#### TASK-6.3: Implement performance and load testing ⏳ **PENDING**
- **Description**: Test system under load with multiple pumps and protocols
- **Load Testing**:
- Concurrent protocol connections
@ -439,22 +441,34 @@ This document outlines the comprehensive step-by-step implementation plan for th
- Response times within requirements
- Resource utilization acceptable
- No memory leaks or performance degradation
- **Current Status**: Not implemented
#### TASK-6.4: Create failure mode and recovery tests ✅ **COMPLETE**
#### TASK-6.4: Create failure mode and recovery tests ⏳ **PENDING**
- **Description**: Test system behavior during failures and recovery
- **Failure Scenarios**:
- Database connection loss
- Network connectivity issues
- Protocol server failures
- Safety system failures
- Emergency stop scenarios
- Resource exhaustion
- **Recovery Testing**:
- Automatic failover procedures
- System restart and recovery
- Data consistency after recovery
- Manual intervention procedures
- **Acceptance Criteria**:
- System handles failures gracefully
- Recovery procedures work correctly
- No data loss during failures
- Manual override capabilities functional
- System fails safely
- Recovery automatic where possible
- Alerts generated for failures
- Data integrity maintained
- **Current Status**: Not implemented
#### TASK-6.5: Implement health monitoring and metrics
#### TASK-6.5: Implement health monitoring and metrics ⏳ **PENDING**
- **Description**: Prometheus metrics and health checks
- **Monitoring Areas**:
- System health and availability