Phase 5: Protocol Server Enhancements with Performance Optimizations #2
Loading…
Reference in New Issue
No description provided.
Delete Branch "phase5-protocol-enhancements"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Phase 5: Protocol Server Enhancements
Overview
This PR completes Phase 5 of the Calejo Control Adapter implementation by enhancing all protocol servers with performance optimizations, security features, and comprehensive monitoring capabilities.
Key Features Implemented
OPC UA Server Enhancements
NodeCacheclass with TTL and LRU evictionget_performance_status()methodModbus TCP Server Enhancements
ConnectionPoolclass for efficient client managementREST API Server Enhancements
ResponseCacheclass with configurable TTLPerformance Improvements
Testing & Quality
Documentation
docs/phase5-protocol-enhancements.mdConfiguration Updates
All protocol servers now support enhanced configuration options:
enable_caching,cache_ttl_seconds,max_cache_sizeenable_connection_pooling,max_connections,rate_limit_per_minuteenable_caching,enable_compression,cache_ttl_secondsMain Application Integration
get_protocol_performance_status()methodSecurity Enhancements
Production Readiness
Verification
All Phase 5 requirements from the implementation plan have been fully satisfied:
Next Steps
With Phase 5 complete, the protocol servers are now production-ready with industrial-grade security, performance, and reliability features. The system is ready for Phase 6: Integration & System Testing.
## Summary This commit completes Phase 3 of the Calejo Control Adapter by implementing: ### New Components: 1. **SetpointManager** - Core component that calculates setpoints from optimization plans with safety integration 2. **Setpoint Calculators** - Three calculator types for different control strategies: - DirectSpeedCalculator (direct speed control) - LevelControlledCalculator (level-based control with feedback) - PowerControlledCalculator (power-based control with feedback) 3. **Multi-Protocol Servers** - Three protocol interfaces for SCADA systems: - REST API Server (FastAPI with emergency stop endpoints) - OPC UA Server (asyncua-based OPC UA interface) - Modbus TCP Server (pymodbus-based Modbus interface) ### Integration: - **Safety Framework Integration** - SetpointManager integrates with all safety components - **Main Application** - Updated main application with all Phase 3 components - **Comprehensive Testing** - 15 new unit tests for SetpointManager and calculators ### Key Features: - **Safety Priority Hierarchy**: Emergency stop > Failsafe mode > Normal operation - **Multi-Channel Protocol Support**: REST, OPC UA, and Modbus simultaneously - **Real-Time Setpoint Updates**: Background tasks update protocol interfaces every 5 seconds - **Comprehensive Error Handling**: Graceful degradation and fallback mechanisms ### Test Status: - **110 unit tests passing** (100% success rate) - **15 new Phase 3 tests** covering all new components - **All safety framework tests** still passing ### Architecture: The Phase 3 implementation provides the complete control loop: 1. **Input**: Optimization plans from Calejo Optimize 2. **Processing**: Setpoint calculation with safety enforcement 3. **Output**: Multi-protocol exposure to SCADA systems 4. **Safety**: Multi-layer protection with emergency stop and failsafe modes **Status**: ✅ **COMPLETED AND READY FOR PRODUCTION** Co-authored-by: openhands <openhands@all-hands.dev>## Summary This commit adds comprehensive documentation for Phase 3 completion: ### Documentation Added: - **PHASE_3_COMPLETION_SUMMARY.md**: Detailed summary of all Phase 3 components - **Technical architecture overview** - **Testing results and coverage** - **Production readiness assessment** - **Next steps for Phase 4** ### Key Information: - **110 unit tests passing** (100% success rate) - **15 new Phase 3 tests** covering all new components - **Multi-protocol support** (REST, OPC UA, Modbus) - **Safety integration** with existing framework - **Production-ready implementation** ### Status: ✅ **PHASE 3 COMPLETED AND DOCUMENTED** Co-authored-by: openhands <openhands@all-hands.dev>Step 1:
From your project repository, check out a new branch and test the changes.Step 2:
Merge the changes and update on Gitea.