CalejoControl/IMPLEMENTATION_PLAN.md

555 lines
20 KiB
Markdown

# Calejo Control Adapter - Implementation Plan
## Overview
This document outlines the comprehensive step-by-step implementation plan for the Calejo Control Adapter v2.0 with Safety & Security Framework. The plan is organized into 7 phases with detailed tasks, testing strategies, and acceptance criteria.
## Project Timeline & Phases
### Phase 1: Core Infrastructure & Database Setup (Week 1-2)
**Objective**: Establish the foundation with database schema, core infrastructure, and basic components.
#### TASK-1.1: Set up PostgreSQL database with complete schema
- **Description**: Create all database tables as specified in the specification
- **Database Tables**:
- `pump_stations` - Station metadata
- `pumps` - Pump configuration and control parameters
- `pump_plans` - Optimization plans from Calejo Optimize
- `pump_feedback` - Real-time feedback from pumps
- `pump_safety_limits` - Hard operational limits
- `safety_limit_violations` - Audit trail of limit violations
- `failsafe_events` - Failsafe mode activations
- `emergency_stop_events` - Emergency stop events
- `audit_log` - Immutable compliance audit trail
- **Acceptance Criteria**:
- All tables created with correct constraints and indexes
- Read-only user `control_reader` with appropriate permissions
- Test data inserted for validation
- Database connection successful from application
#### TASK-1.2: Implement database client with connection pooling
- **Description**: Enhance database client with async support and robust error handling
- **Features**:
- Connection pooling for performance
- Async/await support for non-blocking operations
- Comprehensive error handling and retry logic
- Query timeout management
- Connection health monitoring
- **Acceptance Criteria**:
- Database operations complete within 100ms
- Connection failures handled gracefully
- Connection pool recovers automatically
- All queries execute without blocking
#### TASK-1.3: Complete auto-discovery module
- **Description**: Implement full auto-discovery of stations and pumps from database
- **Features**:
- Automatic discovery on startup
- Periodic refresh of discovered assets
- Filtering by station and active status
- Integration with configuration
- **Acceptance Criteria**:
- All active stations and pumps discovered on startup
- Discovery completes within 30 seconds
- Configuration changes trigger rediscovery
- Invalid stations/pumps handled gracefully
#### TASK-1.4: Implement configuration management
- **Description**: Complete settings.py with comprehensive environment variable support
- **Configuration Areas**:
- Database connection parameters
- Protocol endpoints and ports
- Safety timeout settings
- Security settings (JWT, TLS)
- Alert configuration (email, SMS, webhook)
- Logging configuration
- **Acceptance Criteria**:
- All settings loaded from environment variables
- Type validation for all configuration values
- Sensitive values properly secured
- Configuration errors provide clear messages
#### TASK-1.5: Set up structured logging and audit system
- **Description**: Implement structlog with JSON formatting and audit trail
- **Features**:
- Structured logging in JSON format
- Correlation IDs for request tracing
- Audit trail for compliance requirements
- Log levels configurable at runtime
- Log rotation and retention policies
- **Acceptance Criteria**:
- All log entries include correlation IDs
- Audit events logged to database
- Logs searchable and filterable
- Performance impact < 5% on operations
### Phase 2: Safety Framework Implementation (Week 3-4)
**Objective**: Implement comprehensive safety mechanisms to prevent equipment damage and operational hazards.
#### TASK-2.1: Complete SafetyLimitEnforcer with all limit types
- **Description**: Implement multi-layer safety limits enforcement
- **Limit Types**:
- Speed limits (hard min/max)
- Level limits (min/max, emergency stop, dry run protection)
- Power and flow limits
- Rate of change limits
- Operational limits (starts per hour, run times)
- **Acceptance Criteria**:
- All setpoints pass through safety enforcer
- Violations logged and reported
- Rate of change limits prevent sudden changes
- Emergency stop levels trigger immediate action
#### TASK-2.2: Implement DatabaseWatchdog with failsafe mode
- **Description**: Monitor database updates and trigger failsafe when updates stop
- **Features**:
- 20-minute timeout detection
- Automatic revert to default setpoints
- Alert generation on failsafe activation
- Automatic recovery when updates resume
- **Acceptance Criteria**:
- Failsafe triggered within 20 minutes of no updates
- Default setpoints applied correctly
- Alerts sent to operators
- System recovers automatically when updates resume
#### TASK-2.3: Implement EmergencyStopManager with big red button
- **Description**: System-wide and targeted emergency stop functionality
- **Features**:
- Single pump emergency stop
- Station-wide emergency stop
- System-wide emergency stop
- Manual clearance with audit trail
- Integration with all protocol interfaces
- **Acceptance Criteria**:
- Emergency stop triggers within 1 second
- All affected pumps set to default setpoints
- Clear audit trail of stop/clear events
- REST API endpoints functional
#### TASK-2.4: Implement AlertManager with multi-channel alerts
- **Description**: Email, SMS, webhook, and SCADA alarm integration
- **Alert Channels**:
- Email alerts with configurable recipients
- SMS alerts for critical events
- Webhook integration for external systems
- SCADA HMI alarm integration via OPC UA
- **Acceptance Criteria**:
- Alerts delivered within 30 seconds
- Multiple delivery attempts for failed alerts
- Alert content includes all relevant context
- Alert history maintained
#### TASK-2.5: Create comprehensive safety tests
- **Description**: Test all safety scenarios including edge cases and failure modes
- **Test Scenarios**:
- Normal operation within limits
- Safety limit violations
- Failsafe mode activation and recovery
- Emergency stop functionality
- Alert delivery verification
- **Acceptance Criteria**:
- 100% test coverage for safety components
- All failure modes tested and handled
- Performance under load validated
- Integration with other components verified
### Phase 3: Plan-to-Setpoint Logic Engine (Week 5-6)
**Objective**: Implement control logic for different pump types with safety integration.
#### TASK-3.1: Implement SetpointManager with safety integration
- **Description**: Coordinate safety checks and setpoint calculation
- **Integration Points**:
- Emergency stop status checking
- Failsafe mode detection
- Safety limit enforcement
- Control type-specific calculation
- **Acceptance Criteria**:
- Safety checks performed before setpoint calculation
- Emergency stop overrides all other logic
- Failsafe mode uses default setpoints
- Performance: setpoint calculation < 10ms
#### TASK-3.2: Create control calculators for different pump types
- **Description**: Implement calculators for DIRECT_SPEED, LEVEL_CONTROLLED, POWER_CONTROLLED
- **Calculator Types**:
- DirectSpeedCalculator: Direct speed control
- LevelControlledCalculator: Level-based control with PID
- PowerControlledCalculator: Power-based optimization
- **Acceptance Criteria**:
- Each calculator produces valid setpoints
- Control parameters configurable per pump
- Feedback integration for adaptive control
- Smooth transitions between setpoints
#### TASK-3.3: Implement feedback integration
- **Description**: Use real-time feedback for adaptive control
- **Feedback Sources**:
- Actual speed measurements
- Power consumption
- Flow rates
- Wet well levels
- Pump running status
- **Acceptance Criteria**:
- Feedback used to validate setpoint effectiveness
- Adaptive control based on actual performance
- Feedback delays handled appropriately
- Invalid feedback data rejected
#### TASK-3.4: Create plan-to-setpoint integration tests
- **Description**: Test all control scenarios with safety integration
- **Test Scenarios**:
- Normal optimization plan execution
- Control type-specific calculations
- Safety limit integration
- Emergency stop override
- Failsafe mode operation
- **Acceptance Criteria**:
- All control scenarios tested
- Safety integration verified
- Performance requirements met
- Edge cases handled correctly
### Phase 4: Multi-Protocol Server Implementation (Week 7-8)
**Objective**: Implement OPC UA, Modbus TCP, and REST API servers with security.
#### TASK-4.1: Implement OPC UA Server with asyncua
- **Description**: Create OPC UA server with pump data nodes and alarms
- **OPC UA Features**:
- Pump setpoint nodes (read/write)
- Status and feedback nodes (read-only)
- Alarm and event notifications
- Security with certificates
- Historical data access
- **Acceptance Criteria**:
- OPC UA clients can connect and read data
- Setpoint changes processed through safety layer
- Alarms generated for safety events
- Performance: < 100ms response time
#### TASK-4.2: Implement Modbus TCP Server with pymodbus
- **Description**: Create Modbus server with holding registers for setpoints
- **Modbus Features**:
- Holding registers for setpoints
- Input registers for status and feedback
- Coils for control commands
- Multiple slave support
- Error handling and validation
- **Acceptance Criteria**:
- Modbus clients can read/write setpoints
- Data mapping correct and consistent
- Error responses for invalid requests
- Performance: < 50ms response time
#### TASK-4.3: Implement REST API with FastAPI
- **Description**: Create REST endpoints for monitoring and emergency stop
- **API Endpoints**:
- Emergency stop management
- Safety status and violations
- Pump and station information
- System health and metrics
- Configuration management
- **Acceptance Criteria**:
- All endpoints functional and documented
- Authentication and authorization working
- OpenAPI documentation generated
- Performance: < 200ms response time
#### TASK-4.4: Implement security layer for all protocols
- **Description**: Authentication, authorization, and encryption for all interfaces
- **Security Features**:
- JWT token authentication for REST API
- Certificate-based authentication for OPC UA
- IP-based access control for Modbus
- Role-based authorization
- TLS/SSL encryption
- **Acceptance Criteria**:
- Unauthorized access blocked
- Authentication required for sensitive operations
- Encryption active for all external communications
- Security events logged to audit trail
#### TASK-4.5: Create protocol integration tests
- **Description**: Test all protocol interfaces with simulated SCADA clients
- **Test Scenarios**:
- OPC UA client connectivity and data access
- Modbus TCP register mapping and updates
- REST API endpoint functionality
- Security and authentication testing
- Performance under concurrent connections
- **Acceptance Criteria**:
- All protocols functional with real clients
- Security controls effective
- Performance requirements met under load
- Error conditions handled gracefully
### Phase 5: Security & Compliance Implementation (Week 9)
**Objective**: Implement security features and compliance with IEC 62443, ISO 27001, NIS2.
#### TASK-5.1: Implement authentication and authorization
- **Description**: JWT tokens, role-based access control, and certificate auth
- **Security Controls**:
- Multi-factor authentication support
- Role-based access control (RBAC)
- Certificate pinning for OPC UA
- Session management and timeout
- Password policy enforcement
- **Acceptance Criteria**:
- All access properly authenticated
- Authorization rules enforced
- Session security maintained
- Security events monitored and alerted
#### TASK-5.2: Implement audit logging for compliance
- **Description**: Immutable audit trail for IEC 62443, ISO 27001, NIS2
- **Audit Requirements**:
- All security events logged
- Configuration changes tracked
- User actions recorded
- System events captured
- Immutable log storage
- **Acceptance Criteria**:
- Audit trail complete and searchable
- Logs protected from tampering
- Compliance reports generatable
- Retention policies enforced
#### TASK-5.3: Implement TLS/SSL encryption
- **Description**: Secure communications for all protocols
- **Encryption Implementation**:
- TLS 1.3 for REST API
- OPC UA Secure Conversation
- Certificate management and rotation
- Cipher suite configuration
- Perfect forward secrecy
- **Acceptance Criteria**:
- All external communications encrypted
- Certificates properly validated
- Encryption performance acceptable
- Certificate expiration monitored
#### TASK-5.4: Create security compliance documentation
- **Description**: Document compliance with standards and security controls
- **Documentation Areas**:
- Security architecture documentation
- Compliance matrix for standards
- Security control implementation details
- Risk assessment documentation
- Incident response procedures
- **Acceptance Criteria**:
- Documentation complete and accurate
- Compliance evidence documented
- Security controls mapped to requirements
- Documentation maintained and versioned
### Phase 6: Integration & System Testing (Week 10-11)
**Objective**: End-to-end testing and validation of the complete system.
#### TASK-6.1: Set up test database with realistic data
- **Description**: Create test data for multiple stations and pump scenarios
- **Test Data**:
- Multiple pump stations with different configurations
- Various pump types and control strategies
- Historical optimization plans
- Safety limit configurations
- Realistic feedback data
- **Acceptance Criteria**:
- Test data covers all scenarios
- Data relationships maintained
- Performance testing possible
- Edge cases represented
#### TASK-6.2: Create end-to-end integration tests
- **Description**: Test full system workflow from optimization to SCADA
- **Test Workflows**:
- Normal optimization control flow
- Safety limit violation handling
- Emergency stop activation and clearance
- Failsafe mode operation
- Protocol integration testing
- **Acceptance Criteria**:
- All workflows function correctly
- Data flows through entire system
- Performance meets requirements
- Error conditions handled appropriately
#### TASK-6.3: Implement performance and load testing
- **Description**: Test system under load with multiple pumps and protocols
- **Load Testing**:
- Concurrent protocol connections
- High-frequency setpoint updates
- Multiple safety limit checks
- Database query performance
- Memory and CPU utilization
- **Acceptance Criteria**:
- System handles expected load
- Response times within requirements
- Resource utilization acceptable
- No memory leaks or performance degradation
#### TASK-6.4: Create failure mode and recovery tests
- **Description**: Test system behavior during failures and recovery
- **Failure Scenarios**:
- Database connection loss
- Network connectivity issues
- Protocol server failures
- Safety system failures
- Resource exhaustion
- **Acceptance Criteria**:
- System fails safely
- Recovery automatic where possible
- Alerts generated for failures
- Data integrity maintained
#### TASK-6.5: Implement health monitoring and metrics
- **Description**: Prometheus metrics and health checks
- **Monitoring Areas**:
- System health and availability
- Performance metrics
- Safety system status
- Protocol connectivity
- Resource utilization
- **Acceptance Criteria**:
- All critical metrics monitored
- Health checks functional
- Alert thresholds configured
- Dashboard available for visualization
### Phase 7: Deployment & Production Readiness (Week 12)
**Objective**: Prepare for production deployment with operational support.
#### TASK-7.1: Complete Docker containerization
- **Description**: Optimize Dockerfile and create docker-compose for production
- **Containerization**:
- Multi-stage Docker build
- Security scanning and vulnerability assessment
- Resource limits and constraints
- Health check implementation
- Logging configuration
- **Acceptance Criteria**:
- Container builds successfully
- Security vulnerabilities addressed
- Resource usage optimized
- Logging functional in container
#### TASK-7.2: Create deployment documentation
- **Description**: Deployment guides, configuration examples, and troubleshooting
- **Documentation**:
- Installation and setup guide
- Configuration reference
- Troubleshooting guide
- Upgrade procedures
- Backup and recovery procedures
- **Acceptance Criteria**:
- Documentation complete and accurate
- Step-by-step procedures validated
- Common issues documented
- Maintenance procedures clear
#### TASK-7.3: Implement monitoring and alerting
- **Description**: Grafana dashboards, alert rules, and operational monitoring
- **Monitoring Setup**:
- Grafana dashboards for all metrics
- Alert rules for critical conditions
- Log aggregation and analysis
- Performance trending
- Capacity planning data
- **Acceptance Criteria**:
- Dashboards provide operational visibility
- Alerts generated for critical conditions
- Logs searchable and analyzable
- Performance baselines established
#### TASK-7.4: Create backup and recovery procedures
- **Description**: Database backup, configuration backup, and disaster recovery
- **Backup Strategy**:
- Database backup procedures
- Configuration backup
- Certificate and key backup
- Recovery procedures
- Testing of backup restoration
- **Acceptance Criteria**:
- Backup procedures documented and tested
- Recovery time objectives met
- Data integrity maintained
- Backup success monitored
#### TASK-7.5: Final security review and hardening
- **Description**: Security audit, vulnerability assessment, and hardening
- **Security Activities**:
- Penetration testing
- Vulnerability scanning
- Security configuration review
- Access control validation
- Security incident response testing
- **Acceptance Criteria**:
- All security vulnerabilities addressed
- Security controls validated
- Incident response procedures tested
- Production security posture established
## Testing Strategy
### Unit Testing
- **Coverage**: 90%+ code coverage for all components
- **Focus**: Individual component functionality
- **Tools**: pytest, pytest-asyncio, pytest-cov
### Integration Testing
- **Coverage**: All component interactions
- **Focus**: Data flow between components
- **Tools**: pytest with test database
### System Testing
- **Coverage**: End-to-end workflows
- **Focus**: Complete system functionality
- **Tools**: Docker Compose, test automation
### Performance Testing
- **Coverage**: Load and stress testing
- **Focus**: Response times and resource usage
- **Tools**: Locust, k6, custom load generators
### Security Testing
- **Coverage**: All security controls
- **Focus**: Vulnerability assessment
- **Tools**: OWASP ZAP, security scanners
## Risk Management
### Technical Risks
- Database performance under load
- Protocol compatibility with SCADA systems
- Safety system reliability
- Security vulnerabilities
### Mitigation Strategies
- Performance testing early and often
- Protocol testing with real SCADA systems
- Redundant safety mechanisms
- Regular security assessments
## Success Criteria
### Functional Requirements
- All safety mechanisms operational
- Multi-protocol support functional
- Real-time performance requirements met
- Compliance with standards achieved
### Non-Functional Requirements
- 99.9% system availability
- Sub-second response times
- Secure operation validated
- Comprehensive documentation
## Conclusion
This implementation plan provides a comprehensive roadmap for developing the Calejo Control Adapter v2.0 with Safety & Security Framework. The phased approach ensures systematic development with thorough testing at each stage, resulting in a robust, secure, and reliable system for municipal wastewater pump station control.