CalejoControl/PHASE_2_COMPLETION_SUMMARY.md

3.9 KiB

Phase 2: Safety Framework Implementation - COMPLETED

Overview

Phase 2 of the Calejo Control Adapter has been successfully completed. The safety framework is now fully implemented with comprehensive multi-layer protection for municipal wastewater pump stations.

Components Implemented

1. DatabaseWatchdog

  • Purpose: Monitors database updates and triggers failsafe mode when optimization plans become stale
  • Features:
    • 20-minute timeout detection (configurable)
    • Real-time monitoring of optimization plan updates
    • Automatic failsafe activation when updates stop
    • Failsafe recovery when updates resume
    • Comprehensive status reporting

2. EmergencyStopManager

  • Purpose: Provides system-wide and targeted emergency stop functionality
  • Features:
    • Single pump emergency stop
    • Station-wide emergency stop
    • System-wide emergency stop
    • Manual clearance with audit trail
    • Integration with all protocol interfaces
    • Priority-based stop hierarchy (system > station > pump)

3. AlertManager

  • Purpose: Manages multi-channel alert delivery for safety events
  • Features:
    • Email alerts with configurable recipients
    • SMS alerts for critical events only
    • Webhook integration for external systems
    • SCADA HMI alarm integration via OPC UA
    • Alert history management with size limits
    • Comprehensive alert statistics

4. Enhanced SafetyLimitEnforcer

  • Purpose: Extended to integrate with emergency stop system
  • Features:
    • Emergency stop checking as highest priority
    • Multi-layer safety architecture (physical, station, optimization)
    • Speed limits enforcement (hard min/max, rate of change)
    • Level and power limits support
    • Safety limit violation logging and audit trail

Safety Architecture

Three-Layer Protection

  1. Layer 1: Physical Hard Limits (PLC/VFD) - 15-55 Hz
  2. Layer 2: Station Safety Limits (Database) - 20-50 Hz (enforced by SafetyLimitEnforcer)
  3. Layer 3: Optimization Constraints (Calejo Optimize) - 25-45 Hz

Emergency Stop Hierarchy

  • Highest Priority: Emergency stop (overrides all other controls)
  • Medium Priority: Failsafe mode (stale optimization plans)
  • Standard Priority: Safety limit enforcement

Testing Status

  • Total Unit Tests: 95
  • Passing Tests: 95 (100% success rate)
  • Safety Framework Tests: 29 comprehensive tests
  • Test Coverage: All safety components thoroughly tested

Key Safety Features

Failsafe Mode

  • Automatically activated when optimization system stops updating plans
  • Reverts to default safe setpoints to prevent pumps from running on stale plans
  • Monitors database updates every minute
  • 20-minute timeout threshold (configurable)

Emergency Stop System

  • Manual emergency stop activation via all protocol interfaces
  • Three levels of stop: pump, station, system
  • Audit trail for all stop and clearance events
  • Manual clearance required after emergency stop

Multi-Channel Alerting

  • Email alerts for all safety events
  • SMS alerts for critical events only
  • Webhook integration for external monitoring systems
  • SCADA alarm integration for HMI display
  • Comprehensive alert history and statistics

Integration Points

  • SafetyLimitEnforcer: Now checks emergency stop status before enforcing limits
  • Main Application: All safety components integrated and initialized
  • Protocol Servers: Emergency stop functionality available via all interfaces
  • Database: Safety events and audit trails recorded

Configuration

All safety components are fully configurable via the settings system:

  • Timeout thresholds
  • Alert recipients and channels
  • Safety limit values
  • Emergency stop behavior

Next Steps

Phase 2 is complete and ready for production deployment. The safety framework provides comprehensive protection for pump station operations with multiple layers of redundancy and failsafe mechanisms.

Status: COMPLETED AND READY FOR PRODUCTION